Products

Relays

IDEC RELAY SLIM LINE, DPDT, 12V AC 8A, WITH INDICATOR LONG LEAD TIME**INDENT TO RJ2S-CL-A12

Product Code: RJ2S-CL-A12

The IDEC RJ2S-CL-A12 is a slim line, DPDT relay designed for efficient power switching. With a 12V AC coil and an 8A contact rating, it features a large switching capacity suitable for various applications. This environmentally conscious relay is free from hazardous substances such as lead, cadmium, mercury, hexavalent chromium, PBB, and PBDE. It meets safety and performance standards with UL recognition, CSA certification, and EN compliance. An indicator provides visual confirmation of operation, enhancing its utility in power management tasks.

Technical Specifications

Operating Humidity 5 to 85%
Terminal Shape Blade Terminal
Resistance to Shock (m/s²) 1000
Model With LED
Brand IDEC
Operational Temperature Range (°C) -40 to 70
Coil Voltage AC (V) 12
Contact Material Silver-Nickel Alloy
Contact Resistance (mO) 50
Contacts DPDT
Minimum Electrical Life 200,000
Minimum Mechanical Life 30,000,000
No. of Poles 2
Operating Time 15ms (Max)
Resistance to Vibrations 10 to 55Hz
Dimensions (mm) 31.1W x 33H x 12.7D
Weight (g) 19
Degree of Protection IP40

Documents

Products to compare:
Comparing Products